연구보고서 상세보기
부서명 방재연구실
발행년도 2016
간행물 번호 11-1750140-000189-01
연구보고서명 Construction of Forecasting and Warning System for Disaster Risk Reduction in Vietnam and Lao PDR (I)
참여연구원 이치헌 외 40명
보고서 pdf Construction of Forecasting and Warning System for Disaster Risk Reduction in Vietnam and Lao PDR (Ⅰ).pdf
요약 Summary

Ⅰ. Title
   Construction of forecasting and warning system for disaster risk reduction in Vietnam and Lao PDR(Ⅰ)

Ⅱ. Objectives
   1. Floods in mountainous area due to flash flood which has short travel time and fast velocity characteristic cause the facilities and human life, and need to fundamental corresponding measures for damage reduction
   2. Need to technology combination and diffusion of “ARWS(Automated Rainfall Warning System)” and “FFAS(Flash Flood Alert System)” for damage reduction in domestic mountains and valleys
   3. Training and technological skills transfer for system application of recipient country after project completion

Ⅲ. Contents
   1. Pre-investigation for advancement of the FFAS (Flash Flood Alert System) and installation of the additional ARWS (Automatic Rainfall Warning System)
      A. Data collection and selection of the potential sites for system installation
   2. Demonstration construction of the FFAS and ARWS
      A. Demonstration construction of FFAS in Vietnam and Lao PDR
      B. Demonstration construction of ARWS (two water gauges, two rain gauges and warning stations for each country)
   3. Calibration of the FFAS and the ARWS
   4. River survey for target area and implementation of hydraulic and hydrological analysis
      A. River survey for the major sites of the basin (including main river and points) through field survey for the existing rain and water level gauge sites
      B. Establishment of the warning criteria using water level data of the basin
   5. Analysis of the risk against a flash flood occurring in target area and construction of the risk map
      A. Dividing watershed by applying the concept of flash flood
      B. Construction of the flash flood map (1:5,000) through risk analysis
   6. System training for public officers and experts related to disaster management of Vietnam and Lao PDR
      A. In-depth training of theory and practical exercise of hydraulic and hydrological analysis for experts
      B. System operation training for local site personnel
      C. Production of detailed manual related to the system maintenance and operation
   7. Write the reports of the ODA project
      A. Performance report and satisfaction survey report
   8. Make the publicity material(English, Vietnamese and Lao language) in each country of “Construction of forecasting and warning system for disaster mitigation in Vietnam and Lao PDR”
      A. Make the pamphlet and promotional video of the ODA project

Ⅳ. Conclusions
   1. Construction of the ARWS(two rain gauges, two water gauges and two warning stations)
   2. Construction of FFAS in Vietnam and Lao PDR
   3. Writing a flooding map and a risk map of target area
   4. Establishment of warning criteria through river survey
조회수 50068