요약 Ⅰ. Title
   Construction of forecasting and warning system for disaster risk reduction in Vietnam and Lao PDR(Ⅱ)


Ⅱ. Objectives
  1. Necessity of fundamental countermeasures for the disaster damage in the mountainous region caused by flash flood,
     which cause damage to facilities and human life because of fast velocity, due to localized heavy rainfall
  2. The reduction of damage caused by flash flood in cooperation countries through the transfer of domestic disaster
     prevention techniques such as Flash Flood Alert System (FFAS), Automatic Rainfall Warning System (ARWS) etc.
     is necessary
  3. Conduction of education program and disaster prevention technique’s transfer for the application and maintenance of the
     techniques after the ODA project is completed


Ⅲ. Contents
  1. Pre-investigation for advancement of the FFAS and installation of the additional ARWS
    a. Target watershed base data collection
    b. Pre-feasibility study

  2. Extension of FFAS and ARWS
    a. Select installation location
    b. Extension of FFAS
    c. Extension of ARWS

  3. Calibration of the FFAS and the ARWS

  4. River survey for target area and implementation of hydraulic and hydrological analysis
    a. Measuring the site survey of the target area through site survey
    b. Establishment of the warning criteria using water level data of the basin

  5. Analysis of the risk against a flash flood occurring in target area and construction of the risk map
    a. Dividing watershed by applying the concept of flash flood
    b. Risk mapping of flash flood through the risk analysis

  6. System training for public officers and experts related to disaster management of Vietnam and Lao PDR
    a. Detailed documentation for maintenance and operation system
    b. System operation training and education

  7. ODA project performance report preparation and satisfaction survey report preparation and publicity planning
    a. ODA project satisfaction survey plan establishment
    b. ODA project achievements and publicity materials


Ⅳ. Conclusions
  1. Construction of the ARWS
  2. Construction of FFAS
  3. Writing a flooding map and a risk map of target area
  4. Establishment of warning criteria
  5. Prepare ODA project report and promotional materials